A buyer's real question is not "can you make it." It is what gets checked, what paper you can have with the parts, and what happens when one is wrong. This page answers all three.

Inspection paperwork when you need it

A first-article inspection report and a signed certificate of conformance come with your order when you ask for them: tick the box on your quote. The price shows before you pay. Material traceable to the lot. Our inspection procedures are documented, and you can ask to read them.

Black machined plastic saddle brackets on a granite plate beside a height gage

What gets checked, and how

  • The first article, when you order the report. The first piece of each part number is measured against your drawing, and the report ships with the parts.
  • The dimensions you call out. The firm-quote form has a field for the two or three that have to be right; those are the ones that get measured.
  • Plastic relaxes after the cut, and a part measured warm off the machine reads differently the next morning. Ask when your parts were measured.
  • The model, before anything is cut. The quote tool checks walls, inside corners, hole depth and part size against the limits printed on the service pages, and a part that fails goes to a person before it can be bought.
  • If your receiving inspection needs a particular report or gage record, say so in the request. The quote states what comes with the job before you order.

How plastic is different

  • It expands five to ten times as much as steel for the same temperature change. A two-foot polyethylene part cannot hold the tolerance a two-foot steel part can.
  • Nylon takes on water and grows, up to about 2% in length when saturated. A nylon tolerance needs a stated condition.
  • Clamping distorts it. A part that measures right in the vise can spring when it is let go.
  • So every tolerance here carries a material. If your print asks for something the material will not keep, you hear that before anything is cut, with what we would do instead.

When something is wrong

  • Call 847-260-8104. You reach the engineer who ran the job, not a ticket queue.
  • If a part does not meet the print, we remake it or refund it.
  • If the fault is in the drawing or the material and not in the cut, we say that too, with what we would change.
  • Or reply to any order email and say which dimension is off. It comes to the same place.
  • Sooner is better. Send the print with the request, call out what matters, and we flag the features we are unsure about before cutting.

Paperwork, when you ask for it

  • A first-article inspection report, when you ask for it. The first piece of each part number is measured against your drawing and the measurements are written down.
  • A certificate of conformance, when you ask for it. It lists each part with its revision, material and quantity, states that the parts were made and inspected to your drawing and purchase order, and is signed.
  • When you order the certificate, the material lot is written on it against each line, so a part can be traced back to the stock it was cut from.
  • How to ask: tick the box on your quote, or on the firm-quote form. The price shows before you pay. Both add a fee, shown as its own line.
  • The stock maker's or distributor's material cert, passed through when you ask for it.

Supplier forms: W-9, certificate of insurance and NDA returned within a business day. Part touches food? Read what a machine shop can and cannot certify.

Dates and status, in writing

  • Standard lead time is 7 to 10 business days; expedited is 3 to 5 business days. The ship-by date shows at checkout before you pay.
  • The same date is on the order confirmation, and your order page shows where the job stands.
  • A drawing sent with an order is reviewed before cutting. If it changes the price, you hear from us before work starts.
  • Anodize and powder coat are sent out to a finisher. Bead blasting is done here. Parts with a sent-out finish ship on the standard lead time.
  • When the order ships you get an email, with the carrier and tracking number when there is one.

The form takes a drawing, your quantities and the dimensions that matter. The engineer who will run the job reads it and replies within 24 hours. Have a STEP file and under 100 pieces? See the price now.